Great Lake Trail 2 day transport package with Scott Full Sus MTB Hire (E-MTB Upgrades available)
- Duration: 2 Days (approx.)
- Location: Taupo
- Product code: GLT full Bike hire
Day 1 on the Great Lake Trail. (30KM Waihaha- Waihora section)
Pick up locations can be negotiated however normally you meet at our Base on 413 Huka falls road at 8:20am to depart by 8:30am this day has a boat transfer at 2:30pm from the end of the trail...We will transport you to the start of the Waihaha trail on the Western side of Lake Taupo. From here you will ride the 30km trail to Waihora bay at the lake edge, where the pre arranged boat shuttle 2:30 pm, will meet you on a scenic route back to Kinloch where we will transfer you back to our Base and take care of the bikes over night so they are ready to go for day 2.
Day 2
Meet again at our base or pre arranged pick up point we will shuttle you to Orakau (the start of the 20km K2K section). You will then enjoy the K2K section of the Great Lake Trail to Kinloch via Kawakawa bay were you could swim if you like (and its warm enough). Kinloch has a food opportunity at the Kinloch Corner dairy which does great burgers, coffee hot chips etc.
After Kinloch you continue onto the W2K trail via the archway bridge over the marina. This 14km trail with optional 9.5km headland loop will lead you back to the lake edge in Whakaipo bay. From here we will pick you up and transport you back to our base at 413 Huka falls road.
Price includes all transport needs (2 x return road transfers and 1 x scenic boat transfer) and 2 days hire of a Full suspension Scott mountain bike with 1x12 Sram gears, Dual lock out suspension and dropper posts.
Upgrade to a Hardtail E bike $40
Upgrade to a full sus E bike for $70